To write a tender, read the whole pack, decide whether to bid, plan each answer against the scoring criteria, and write specific, evidence-backed responses within the word limit. Then check compliance, get a second reviewer and submit early through the buyer's portal.
Rules every UK tender writer should know
Procurement Act 2023
In force
Most new UK public procurements run under it.
Award test
Most advantageous tender
Replaces 'most economically advantageous tender'.
PPN 002
10% min weighting
Social value in in-scope central government contracts.
PPN 017
AI disclosure
Buyers may ask how you used AI in your bid.
Before you write: read the tender pack¶
Knowing how to write a tender starts with reading. A tender pack usually includes the invitation to tender, specification, questions with weightings and word limits, pricing schedule, contract terms and instructions for submission. Read every document before you write a word, and list the mandatory requirements that could disqualify you: insurance levels, accreditations, financial standing, deadlines and file formats.
- Highlight every 'must' and 'shall' in the specification.
- Note the weighting and word or page limit for each question.
- Check the evaluation scale, often 0 to 5 or 0 to 10, and what each score requires.
- Diary the clarification deadline and submission deadline.
Decide whether to bid¶
Writing a good tender takes days, and frankly that surprises most first-time bidders. Only commit when you meet the mandatory requirements, have relevant evidence, can deliver at the price, and understand what the buyer wants. A simple bid/no-bid score across these factors saves more time than any writing trick.
How to write a tender, step by step¶
Tender writing guide: eight steps
Step 1
Build a compliance matrix
List every requirement and question with its weighting and word limit, and assign an owner.
Step 2
Plan win themes
Pick two or three reasons you are the best choice and thread them through every answer.
Step 3
Structure each answer
Mirror the question's sub-parts in order, using the buyer's own headings.
Step 4
Write specifically
Say what you will do, who does it, when and how you measure it.
Step 5
Add evidence
Back each claim with a case study, figure, accreditation or named process.
Step 6
Answer social value properly
Give measurable commitments linked to the buyer's priorities and how you will report them.
Step 7
Review and edit
Have someone score your answers against the criteria, cut waffle and check word limits.
Step 8
Submit early
Upload through the portal well before the deadline and keep proof of submission.
What a high-scoring answer looks like¶
Describe how you will manage performance and ensure continuous improvement across the contract.
Performance will be measured against the eight KPIs in the specification, reported monthly on a dashboard shared with your contract manager. Our named account manager will chair a monthly review covering KPI results, complaints and actions. Any KPI missed twice triggers a written improvement plan within five working days. Each quarter we will propose one improvement, costed and timed, for your approval. On a comparable contract [insert your real result].
Why it scores
- Links to the buyer's KPIs
- Named roles and frequencies
- Clear escalation
- Room for real evidence
Illustrative example. Replace bracketed text with your own verified results.
Common tender writing mistakes¶
| Mistake | Fix |
|---|---|
| Answering a different question | Mirror the question's sub-parts in order |
| Generic, copied content | Adapt it to the buyer's specification and location |
| Claims without proof | Add figures, case studies and accreditations |
| Ignoring word limits | Plan word counts per sub-part |
| Late or incomplete uploads | Submit a day early and check every file |
Using AI to write a tender¶
AI can save hours on first drafts, summaries and compliance matrices. The risk is generic text that evaluators mark down. Use tools that draft from your own evidence, check every claim, and be ready to explain your AI use if the buyer asks under PPN 017.
How tenders are scored¶
Tenders are scored by turning your words into marks, and you need to know how the buyer does it. Under the Procurement Act 2023, contracts are awarded to the most advantageous tender, judged against award criteria and weightings the buyer must publish in the tender documents. A typical split for a services contract is 60% quality and 40% price, with social value often carrying at least 10% of the total on central government contracts under PPN 002. Each quality question then carries its own share of the quality marks.
| Score | Typical descriptor | What it usually means in practice |
|---|---|---|
| 5 Excellent | Fully meets the requirement with detailed, relevant evidence and added value | Specific method, named roles, KPIs, proof from similar contracts, clear benefit to this buyer |
| 4 Good | Meets the requirement with good detail and some evidence | Solid method but thinner evidence or less tailoring |
| 3 Satisfactory | Meets the requirement with limited detail | Generic description of what you do, little proof |
| 2 Weak | Partially meets the requirement | Misses sub-points of the question or leaves doubts |
| 1 Poor | Major gaps or concerns | Mostly irrelevant or unconvincing |
| 0 Unacceptable | No answer or fails to address the question | Often triggers a minimum-score fail |
A common 0-5 scoring scale. Always use the buyer's own scale and descriptors, which are published in the tender pack.
Many buyers set a minimum quality threshold, for example a score of 2 or more on every question. Fall below it on a single question and you can be excluded however good your price is. That is why a balanced tender, with no weak answers, usually beats one with a few brilliant answers and a couple of rushed ones.
Work out the value of each question before you write. If quality is worth 60% and a question carries 20% of the quality marks, that question is worth 12% of the whole contract. Moving from a 3 to a 4 on it adds 2.4 percentage points to your total, which is often more than the gap between first and second place. Spend your writing hours in the same proportion as the marks.
Plan every answer before you draft¶
The fastest way to write a good tender answer is to plan it on one page first. Copy the question, the evaluation criteria and the word limit into a planning grid, then list what you will say against each point before writing a single sentence.
- Requirement: break the question into its sub-questions. A question asking how you will mobilise, manage staff and report performance has three parts that each need a heading.
- Win theme: the one thing you want the evaluator to remember, tied to the buyer's priorities in the specification.
- Method: the steps, people, tools and timings that show exactly how you will deliver.
- Evidence: figures, case studies, accreditations and client feedback that prove you have done it before.
- Measures: the KPIs and reports you will use to show the buyer it is working.
- Word budget: split the word limit across the sub-questions in proportion to their importance.
Writing techniques that lift scores¶
- Answer first. Open each section with a direct answer, then explain. Evaluators marking 30 submissions will reward the one they can follow.
- Use the buyer's language. If the specification says 'service users', don't write 'customers'. Mirror their headings and terms.
- Replace adjectives with facts. 'High-quality service' scores nothing. '98.6% of monthly audits passed across 14 sites in 2025' does.
- Name roles and frequencies. Say who does what and how often: 'Our contract manager visits each site monthly and reports within five working days.'
- Show the benefit. After each feature, say what it means for the buyer: fewer complaints, lower risk, faster response.
- Keep sentences short. Aim for an average under 20 words and one idea per paragraph.
- Write in the future tense for the new contract. Evaluators score what you will do for them, supported by what you have done before.
Writing the social value section¶
PPN 002 requires central government departments to apply a minimum 10% weighting to social value in the award criteria for covered procurements, and many councils and NHS bodies use similar weightings through the Social Value Act 2012 and the National TOMs framework. The social value question is often the least prepared answer in an SME tender, which makes it one of the easiest places to gain marks.
Pick commitments that relate to the contract and the local area, quantify them and explain how you will report on them. For example: 'We will recruit two of the six operatives for this contract through the council's employment support programme, offer one apprenticeship in year one and report progress quarterly in the contract review meeting.' Avoid listing company-wide charity activity that the buyer can't measure against this contract.
Pricing your tender¶
Price and quality must tell the same story. If your method statement promises a dedicated contract manager and monthly audits, those costs need to be in your price. Evaluators and procurement teams compare the two, and a low price that can't pay for the method described can lead to clarification questions or, where the buyer suspects the price is abnormally low, a request to justify it. The Procurement Act 2023 lets buyers exclude tenders that are abnormally low if the supplier can't explain them satisfactorily.
- Build the price from the bottom up: labour hours, wage rates including any real Living Wage commitment, materials, equipment, management, overheads and margin.
- Check TUPE. If staff will transfer to you from the current provider, request the employee liability information and cost their existing terms.
- Complete the pricing schedule exactly as issued. Don't add rows, change formulas or put qualifications in cells unless the instructions allow it.
- State assumptions only where the buyer invites them, and keep them consistent with your quality answers.
Review before you submit¶
Ask someone who didn't write the answers to score them using the buyer's published scoring scale. This is often called a red team or colour team review. They should mark each answer as an evaluator would, list what is missing and point to any sentence that doesn't earn marks. Then fix the answers, check word counts, run a search for other buyers' names and confirm every attachment is in date. Give the review at least two working days in your plan.
After you submit: feedback and debriefs¶
Win or lose, use the outcome. Under the Procurement Act 2023, buyers must send an assessment summary to each supplier that submitted an assessed tender when they decide to award, explaining how your tender was scored against the award criteria compared with the winning bid. Read it line by line, note where you dropped marks and update your answer library. Most SMEs who win regularly do so because they learn from every loss, not because their first tender was perfect.
How to write a tender for your first public contract¶
If you have never won a public contract, start with lower-value opportunities on Contracts Finder, where central government buyers must publish contracts above £12,000 and other public bodies above £30,000 (both including VAT). Quotes and smaller tenders have shorter questionnaires, and the buyer is often looking for small, local suppliers. Use private-sector contracts as evidence where you lack public-sector references, and explain clearly how the work is comparable in size, complexity and standards. Consider subcontracting to a larger supplier on a framework to build a public-sector track record.
Sector variations to plan for¶
- Construction: expect health and safety questions tied to CDM 2015, PAS 91 style prequalification, method statements and programme planning. Constructionline or CHAS membership is often requested.
- Health and social care: evaluators look for safeguarding, CQC registration and ratings, workforce retention and service user outcomes. Many NHS healthcare services are now procured under the Provider Selection Regime rather than the Procurement Act.
- IT and digital: buyers often use the G-Cloud and Digital Outcomes frameworks, and answers focus on security (Cyber Essentials, ISO 27001), data protection and user research.
- Facilities management: TUPE, staffing levels, supervision, audit regimes and sector standards such as BICSc training or SIA licensing carry heavy weight.
- Professional services: expect questions on team CVs, methodology and quality assurance, with price often evaluated on day rates.
Whatever your sector, the method is the same: read the specification, answer each sub-question in order, prove every claim and price what you promise. Build a library of your best sector answers after each bid so the next tender starts from a strong draft rather than a blank page.
Tools that help¶
See our comparisons of tender automation tools and bid writing software.
Related guides: tender writing examples, tender submission template, how to answer tender questions, tender writing guide and how to win tenders.
Sources
FAQs
Frequently asked questions
- Read the full pack, decide whether to bid, plan answers against the scoring criteria, write specific evidence-backed responses within limits, review, and submit early.
- It varies with the size of the tender. Plan your time backwards from the deadline and leave room for review.
- Everything the buyer asks for: completed questionnaires, answers to each quality question, pricing schedule, and required certificates and policies.
- Evaluators score each answer against published criteria, usually on a 0 to 5 or 0 to 10 scale, then apply the weightings.
- Yes, for drafting and structure, but review everything and be ready to disclose AI use under PPN 017.
- Not answering the question asked, missing mandatory requirements, and generic answers without evidence.
- As long as the word or page limit allows and no longer. Use most of the limit on high-weighted questions, but cut anything that doesn't answer the question or add evidence.
- A quote is usually a short price request for low-value work. A tender is a formal competition with published evaluation criteria, quality questions and a pricing schedule, normally for higher-value contracts.
- Buyers score quality answers against a published scale, usually 0-5 or 0-10, weight them, add price and social value scores and award to the most advantageous tender under the Procurement Act 2023.
- Many SMEs write their own tenders successfully, especially for smaller contracts. A bid writer or AI drafting tool helps when you are short of time or bidding for a large, complex contract, but the operational knowledge must still come from your business.