Free toolNo signup

Free bid / no-bid decision matrix: should you bid for this tender?

Stop pricing tenders you can't win. Score the contract against your firm in under a minute. Six axes, one verdict: Bid, Borderline or No bid. Free, runs in your browser, no signup.

01

Pick the sector

Different sectors weigh different accreditations and risks.

02

Tick the accreditations you actually hold

Only count current, in-date certificates you can produce on demand.

03

Money

Buyers want turnover at minimum two times the contract's annual value, plus three years of accounts.

Turnover ratio: 3.00× the contract value.

04

Region and capacity

Local presence and spare capacity decide more mobilisation scores than any method statement.

Region coverage
Capacity right now
Mobilisation timeline
05

Risk flags

Tick anything the contract requires that you don't already have a track record in.

06

Strategic reasons to bid

The reasons a borderline tender becomes a yes.

Live verdict

59/100

Verdict

No bid

No bid6080Bid

Walk away. Pipeline elsewhere.

Accreditations0/100 · 25% weight
Financial100/100 · 20% weight
Region100/100 · 15% weight
Capacity63/100 · 15% weight
Risk100/100 · 15% weight
Strategic fit0/100 · 10% weight

What's working

  • Turnover 3.0× contract, comfortably above the 2× floor
  • Already operating in the buyer's region
  • No specialist risk flags raised

What's costing you points

  • Missing required: SSIP health and safety (CHAS, SafeContractor, SMAS or similar); ISO 9001 (Quality); Employer's liability £10m and public liability £5m+; CSCS-carded site workforce

Email me my results

Keep a copy for your bid file. No mailing list.

Better use of your week

Skip this one. Find the tenders you can actually win.

AI Tender Writer checks every new UK public sector tender against your profile the day it is published, then drafts the bid from your evidence. Any sector.

Find tenders you can win, free for 7 days
59No bidSee verdict

How the score is calculated

Six axes, weighted average, no magic.

Each axis returns 0 to 100. We multiply by the weight, sum the lot, divide by 100. That's your final score. The verdict bands sit at 80 and 60.

Weight 25%

Required accreditations

SSIP and CSCS for construction. Cyber Essentials for IT. CQC registration for care. Below the required floor, the matrix scores you down hard. Optional accreditations add small uplifts.

Weight 20%

Financial standing

Turnover divided by annual contract value. 2× and above is the common buyer benchmark. Under 1× is a hard penalty. Under 3 years trading also costs you points across the financial axis.

Weight 15%

Region coverage

Already operating in the buyer's region scores 100. Adjacent (work nearby) drops to 60. Mobilising fresh from elsewhere scores 20. Local presence is a silent kingmaker on technical evaluation.

Weight 15%

Capacity and mobilisation

Spare hours plus a fast mobilisation timeline scores high. Tight capacity with a slow start hurts. Slow starts worry evaluators. Most want a mobilisation plan that has you delivering within weeks of award, not months.

Weight 15%

Risk flags

NHS clinical settings, security clearance, safeguarding, a large TUPE transfer, legacy data migration, CDM duties at a new scale. Each risk you can't already evidence deducts 25 from the axis score.

Weight 10%

Strategic fit

First contract in a new sector, framework call-off, existing buyer in another category, geographic fit. The reasons that turn a borderline tender into a yes, but only when the other axes hold.

Why bid / no-bid matters

The single biggest hit-rate lever for SME bid teams.

Hit rate is what makes a bid team profitable. The maths: writing five bids at 40% conversion beats writing twenty bids at 10%, with a fifth of the burnout. The bid no bid decision is what separates those two worlds. Most contractors do it on gut feel. Gut feel says yes far too often.

When to override the matrix

  • Borderline + framework call-off. One win opens four years of mini-comps. Take the borderline.
  • No bid + first reference. If a sub-60 score is your only route into a sector you want long-term, bid lean and price for the reference, not the margin.
  • Bid + over capacity. A high score with no spare hours is a delivery risk. Either subcontract a portion or no-bid.

Worked example

A £400k IT managed service contract scores 77. Borderline, and here is why.

A 35-person managed service provider looks at a council contract to run its service desk and end-user devices. It already supplies the same council with Microsoft 365 licensing. These are the answers it gave the matrix.

FactorScore

Accreditations

25% weight

Cyber Essentials Plus, UK GDPR, £2m PI, ISO 9001 and ISO 27001 held

100

Financial

20% weight

£1.1m turnover on a £400k contract (2.75×), 6 years trading

100

Region

15% weight

Adjacent. Two clients in the next county

60

Capacity

15% weight

Tight, would need to recruit. 4 to 8 week mobilisation

63

Risk

15% weight

One flag: data migration from the incumbent's legacy system

75

Strategic fit

10% weight

Existing buyer, new category

25

Verdict

77 / 100

Borderline

Bid, but only because the buyer already knows them. The weak spots are capacity and the migration. Name the transition lead, line up two contractors before submission, and put a dated migration plan in the mobilisation answer.

The fix for a borderline score is rarely a better answer. It is evidence. If staff transfer with the contract, put a number on it with the TUPE cost estimator, and read how to win public sector contracts before you commit.

Stop filling this in by hand for every tender.

AI Tender Writer runs the check on every new UK public sector tender the day it is published, so you only read the ones worth bidding. Free for 7 days, card required.

Try it free for 7 days

7 days of full Pro. Card required. Nothing is charged when it ends.

What the score looks like in each sector.

Accreditations decide more no-bids than anything else, and the gate differs by market. In construction it is usually SSIP membership, insurance levels and a CSCS-carded workforce; our construction bid writing guide covers what evaluators then look for. In IT, central government buyers expect Cyber Essentials where personal data or ICT services are in scope, and you will be asked how you handle data under UK GDPR.

Care commissioners check CQC registration before anything else; read social care tender writing for the quality side. NHS buyers add the Data Security and Protection Toolkit, and our NHS tenders guide explains where those contracts are advertised. Consultancy lives or dies on professional indemnity and named, qualified people. Facilities management still turns on SSIP, ISO 9001 and service licences.

A verdict of bid is the start, not the finish. Check your selection paperwork with the SQ readiness checker, study the bid writing examples and score your drafts with the bid answer grader. New to public sector work? Read government tenders for small business, then browse live UK contracts and run the matrix on a real one. Plans and prices are on the pricing page.

Bid / no-bid questions, answered.

  • How do you decide whether to bid for a tender?

    Score the tender against your firm before anyone writes a word. Check six things: do you hold every required accreditation, is your turnover big enough for the contract, do you already work in the area, do you have the staff and a realistic start date, does the contract carry risks you have never handled, and is there a strategic reason to want it. Weight them, add them up, and set a line. Ours is 80 for a clear bid and 60 for a borderline call. Anything under 60 is a no bid unless you have a very good reason. The matrix above does the sums in under a minute.

  • What is a good bid / no-bid score?

    80 or above is a bid. 60 to 79 is borderline, which means a strategic call rather than an automatic yes. Under 60 is a no bid. Most SME wins actually come from the borderline band, but only when one or two strategic reasons are real, like a framework that opens four years of call-offs or a first reference in a new sector. If you find yourself inventing strategic reasons to rescue a 55, walk away and spend the week on a better tender.

  • What turnover do I need to bid for a public sector contract?

    Plan on turnover of around twice the annual contract value. Buyers set financial conditions of participation, and two times annual value became the common benchmark under the old rules. Under the Procurement Act 2023 buyers must keep conditions proportionate, so some ask for less, especially on lots aimed at SMEs. Below 1× you will usually fail the financial check no matter how good your delivery is. The matrix scores 2× and above as full marks, 1× to 2× as marginal, and knocks 20 points off if you have traded for less than three years.

  • What are the most common reasons to no-bid a tender?

    Missing a mandatory accreditation tops the list, because it fails you at selection before anyone reads your quality answers. Next come turnover too small for the contract, no presence in the region, and a mobilisation date you can't hit. Then the specialist risks: an NHS clinical setting with no NHS track record, safeguarding with no history of working with children or vulnerable adults, more than 25 staff transferring under TUPE, or a live data migration you have never run. One of these is manageable. Two or more and the incumbent will beat you on technical scores.

  • Is the bid / no-bid tool free, and are my answers saved?

    Yes, it is free with no signup. The scoring runs in your browser and your answers stay there. Refresh the page and they reset. If you want a copy, use the email option under the result and we send you the score and reasons once. No mailing list. Inside an AI Tender Writer account the same checks run against your saved company profile on every new UK public sector tender, so you don't have to fill it in again.

  • Which sectors does the matrix cover?

    Six: construction, IT and digital, health and care, consultancy, facilities management and transport. Each has its own list of the accreditations buyers most often ask for and its own risk flags. Construction checks SSIP, CSCS and insurance levels. IT checks Cyber Essentials, UK GDPR and professional indemnity. Care checks CQC registration, enhanced DBS and the NHS Data Security and Protection Toolkit. The weights stay the same across sectors so you can compare tenders side by side. If your sector is not listed, pick the nearest and treat accreditations as the ones in your tender pack.

  • Does the Procurement Act 2023 change the bid / no-bid decision?

    It changes a few inputs. Since 24 February 2025, new procurements run under the Procurement Act 2023. Conditions of participation must be proportionate to the contract (section 22), buyers must publish more notices, including pipeline notices for larger buyers, and you register once on the Central Digital Platform. That means more early warning of what is coming, and fewer reasons to be ruled out on disproportionate turnover tests. The judgement itself, whether you can win and deliver at a profit, is the same.

  • How long should a bid / no-bid decision take?

    Under an hour for most tenders. Read the specification, the selection criteria and the evaluation weighting first, fill in the matrix, then talk it through with whoever would deliver the contract. Record the verdict and the reasons. If you bid and lose, the reasons help you learn. If you no-bid, they stop the same tender being argued over again next week. Save the long debates for high-value or framework tenders where a win shapes the next four years.

Run the matrix on real UK tenders.

AI Tender Writer stores your profile once and runs this check against every UK public sector tender we find. 7 days free, card required.

Start my free 7-day trial
Browse live tenders

Read next