AI Tender Writer
Browse ContractsFree Tender CheckPricing
About
Sign InStart free trial
AI Tender Writer
Browse ContractsFree Tender CheckPricingAboutHow It Works

Features

See all

Tender alerts

Pro

Daily emails for matched UK tenders. Above your threshold only.

Compliance evaluator

Pro

AI scans the contract pack and scores your fit 0 to 100.

Bid / no-bid decision

Pro

Bid, Borderline, or No bid verdict on every UK public tender.

AI bid drafts

Pro

Selection Questionnaire response generated against your profile.

Company compliance profile

Free + Pro

30+ fields. Powers every scan, draft, alert. Free tier covered.

Verified Supplier Directory

Coming Soon

Public, indexable supplier profile. Get found by below-threshold buyers.

Sectors

Construction

New build, refurb, highways.

IT & digital

Software, cloud, cyber.

Health & care

NHS, domiciliary, clinical.

Consultancy

Advisory, HR, recruitment.

Facilities & FM

Cleaning, security, grounds.

Repairs & maintenance

Planned and reactive works.

Transport

Fleet, SEND, courier.

Education & training

Training, tuition, skills.

Energy

Solar, EV charging, utilities.

Marketing & print

Campaigns, design, print.

Legal & finance

Audit, legal, insurance.

Supplies

Equipment, furniture, kit.

Free tools

See all

Bid / no-bid decision matrix

Six-axis weighted scorer. Bid, Borderline, or No bid in under a minute.

PAS 91 / SQ readiness checker

Tick what you hold. See what's missing. Print or save as PDF.

TUPE cost estimator

Year 1 indicative TUPE cost with risk band against contract value.

Bid cost calculator

Cost per bid, cost per win and break-even for any sector.

CPV code finder

Search all 9,454 CPV codes by word or number.

Procurement threshold checker

Above or below the 2026 Procurement Act thresholds?

Tender scoring calculator

Weighted score, price to win and quality needed.

Tender word counter

Word limits, readability and weak-phrase checks.

Resources

Guides

Step-by-step playbooks on bidding, compliance, and winning.

Alternatives

Single-competitor head-to-heads. Where to switch, where to keep paying.

Comparisons

Listicles and roundups of UK tender platforms, SSIP schemes, bid tools.

Featured

  • Guide

    How to bid for cleaning contracts

  • Alternative

    Constructionline alternatives

  • Comparison

    Best UK tender platforms + bid tools

  • Comparison

    Bid writer vs AI bid tool

Sign inStart free trial
AI Tender Writer

The AI bid writing platform for UK government tenders. Find every public-sector tender, score your fit, and draft SQ-ready responses in minutes.

Browse

  • Live UK tenders
  • Construction tenders
  • IT & digital tenders
  • Health & care tenders
  • Tenders by region
  • Supplier directory (coming soon)

Resources

  • Guides
  • How it works
  • How to write a tender
  • How to win government tenders

Tools

  • All free tools
  • AI bid answer grader
  • Bid / no-bid decision matrix
  • SQ readiness checker
  • TUPE cost estimator
  • Bid cost calculator
  • CPV code finder
  • Procurement threshold checker
  • Tender scoring calculator
  • Tender word counter

Company

  • About
  • Pricing
  • Support
  • Sign in
  • Get started

Legal

  • Privacy policy
  • Cookie policy
  • Terms & conditions

© 2026 Cyber Phoenix Ltd, trading as AI Tender Writer. Built for UK SMEs bidding for public contracts in every sector.

Registered office: 124-128 City Road, London EC1V 2NX, United Kingdom.

Sitemap··aitenderwriter.com
BrowseStart free trial · no card

UK Tenders: Live Public Sector Contracts

Live UK public-sector tenders in every sector, from construction, IT and health and care to consultancy, FM and supplies, from Find a Tender, Contracts Finder and Public Contracts Scotland. Updated daily. Free to browse, no login required.

Tenders tracked

1,362

Open now

281

Median value

£325k

Closing in 7 days

59

Refine results

£
£
4 tendersPage 1 of 1
  • Construction and building works

    Manchester International Airport - Demolition Works · Kier Transportation - CP7 NWC

    KTKier Transportation - CP7 NWC· Leisure centres & sports

    Est. value

    £100k

    "The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."

    North WestEnglandContracts FinderLeisure centres & sports

    Closed 3 Sept 2026

    Est. value

    £100k

    Check my fitView tender
  • Manchester International Airport - Permanent Way Works · Kier Transportation - CP7 NWC

    KTKier Transportation - CP7 NWC· Leisure centres & sports

    Est. value

    £2.5m

    The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.

    North WestEnglandContracts FinderLeisure centres & sports

    Closed 28 Aug 2026

    Est. value

    £2.5m

    Check my fitView tender
  • Manchester International Airport - Steel Parapet Bridge Fascia · Kier Transportation - CP7 NWC

    KTKier Transportation - CP7 NWC· Leisure centres & sports

    Est. value

    £150k

    The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The supply and installation of Steel Parapet Bridge Facia to MIA2 overbridge

    North WestEnglandContracts FinderLeisure centres & sports

    Closed 20 Jul 2026

    Est. value

    £150k

    Check my fitView tender
  • Manchester International Airport - Precast Concrete Beams · Kier Transportation - CP7 NWC

    KTKier Transportation - CP7 NWC· Leisure centres & sports

    Est. value

    £500k

    The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The supply and manufacture of precast concrete SBB units & bridge cill units

    North WestEnglandContracts FinderLeisure centres & sports

    Closed 20 Jul 2026

    Est. value

    £500k

    Check my fitView tender