Tender brief
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry.
This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
The scope areas for this package are as follows:
-Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."
Score your fit and draft your response in 30 seconds.
AI Tender Writer reads the contract pack, scores your stored profile against every requirement, lists missing compliance items, and drafts a Selection Questionnaire response you can edit and submit.
Free to start · 30 seconds · no card
Already a member? Open it in your dashboard
Open the official notice1 tender document published with the notice.
Other open soft FM tenders
Radford House - Internal Refurbishment (Change of Use) · Ramsgate Town Council
Ramsgate Town Council
£500K
7 October 2026
The Refurbishment of RCV's · Cheshire East Borough Council
Cheshire East Borough Council
£1.1M
9 October 2026
Drummond Community Centre Refurbishment · Hedge End Town Council
Hedge End Town Council
£120K
19 October 2026
Construction of carpark at Conningbrook Country Park · Ashford Borough Council
Ashford Borough Council
£400K
23 October 2026
A66 Northern Trans-Pennine (NTP) - Warcop MoD Pre-Construction ECI, Temp Works & Flood Modelling · KIER TRANSPORTATION LIMITED
KIER TRANSPORTATION LIMITED
£2.0M
23 October 2026