High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.